A very important thing in planning to build a house is the availability of images. For planning, the pictures that the absolute minimum required are an image looks, image pieces, and drawing floor plans and location of land. The pictures are needed in the management of Building Permits. In addition to these images, the necessary image detail, drawing electrical construction, water pipe installation drawings and installation drawings sanitai
The desire to imagine imagined spatial layout is made in the form of images. On drawings made as if the bulk viewed from above so it will appear where the room A, room B, the entrance or exit. Home made scale drawings 1:100. That is, each the size of one meter building made of drawings on paper with size 1 cm. In drawing blueprints of the house was listed a room, the location of doors, window location, location bovenlight.
In the drawings should be included elevan floor height (high-low floor desired). This elevan elevation drawings written on the sign ± 0.00 then the floor of the room is the beginning of the measurement of height. When the other room will be made higher or lower then the need to sign + (plus) or – (minus).For example, given the height of the parlor ± 0.00.When the bathroom floor to be lower than 10 cm from the living room floor is -10 then the writing on the picture to bathroom. Meanwhile, if the kitchen will be made 20 cm higher than the living room floor plan on the image to be written +20 kitchens.
B. Related Work the Volume and Job Analysis
In the study of building techniques are usually the calculation of the needs of building materials using job analysis consisted of the need for building materials and wage employment. After the work unit price obtained, compiled BP (Budget Plan) or BPI (Budget Plan Implementation). Detailed discussion about the BP or BPI will be done at a separate chapter.
C. Planning associated with the Time Schedule
An important thing that also was instrumental in the planning of housing construction is making time schedule or scheduling time job. Scheduling is made in table form with a time when jobs are expected to be the kind of work is completed. With the scheduling of work expected housing construction will be done on time. Scheduling is very important because it is closely associated with the financing. The longer the completion of a job the more expensive it will cost to complete the job.
Indeed the timing of completion of work is not done haphazardly; it is necessary Calculation of careful and mature. The amount of time is obtained from the weight value of each job. While the weight of this work was obtained from multiplying the volume of work at a price, then divided by 100%.Time scheduling system of the easiest is to use the S curve. Curve S is one form of the work plan established by the line connecting the dots in the picture so that is shaped like the letter S. Detailed discussion about the scheduling this time will be done separately on chapters time schedule.
A. Planning Related Images
A very important thing in planning to build a house is the availability of images. For planning, the pictures that the absolute minimum required are an image looks, image pieces, and drawing floor plans and location of land. The pictures are needed in the management of Building Permits. In addition to these images, the necessary image detail, drawing electrical construction, water pipe installation drawings and installation drawings sanitai
The desire to imagine imagined spatial layout is made in the form of images. On drawings made as if the bulk viewed from above so it will appear where the room A, room B, the entrance or exit. Home made scale drawings 1:100. That is, each the size of one meter building made of drawings on paper with size 1 cm. In drawing blueprints of the house was listed a room, the location of doors, window location, location bovenlight.
In the drawings should be included elevan floor height (high-low floor desired). This elevan elevation drawings written on the sign ± 0.00 then the floor of the room is the beginning of the measurement of height. When the other room will be made higher or lower then the need to sign + (plus) or – (minus).For example, given the height of the parlor ± 0.00.When the bathroom floor to be lower than 10 cm from the living room floor is -10 then the writing on the picture to KM / WC. Meanwhile, if the kitchen will be made 20 cm higher than the living room floor plan on the image to be written +20 kitchens.
B. Related Work the Volume and Job Analysis
In the study of building techniques are usually the calculation of the needs of building materials using job analysis consisted of the need for building materials and wage employment. After the work unit price obtained, compiled BP (Budget Plan) or BPI (Budget Plan Implementation). Detailed discussion about the BP or BPI will be done at a separate chapter.
C. Planning associated with the Time Schedule
An important thing that also was instrumental in the planning of housing construction is making time schedule or scheduling time job. Scheduling is made in table form with a time when jobs are expected to be the kind of work is completed. With the scheduling of work expected housing construction will be done on time. Scheduling is very important because it is closely associated with the financing. The longer the completion of a job the more expensive it will cost to complete the job.
Indeed the timing of completion of work is not done haphazardly; it is necessary Calculation of careful and mature. The amount of time is obtained from the weight value of each job. While the weight of this work was obtained from multiplying the volume of work at a price, then divided by 100%.Time scheduling system of the easiest is to use the S curve. Curve S is one form of the work plan established by the line connecting the dots in the picture so that is shaped like the letter S. Detailed discussion about the scheduling this time will be done separately on chapters time schedule.



Related Articles
Leave Your Comments Below